ACoP L8 and HSG274
They are quoted together so often that they are often assumed to be one document. They are not, and only one of them carries special legal status.
Two documents, two jobs
L8 is an Approved Code of Practice. Its fourth edition was published in 2013 and is aimed at duty holders: employers and those in control of premises. It tells you what you have to achieve.
HSG274 is technical guidance. It exists because the fourth edition of L8 removed the technical material that had previously been its Part 2 and published it separately. It tells you how to achieve it. If you have been handed a single document that covers both, it predates 2013.
What Approved Code of Practice status means legally
This is the part that matters, and HSE’s own wording repays close reading. Following an ACoP is not compulsory, and you may use alternative methods to comply with the law. If you do follow it, you are doing enough to comply for the matters it covers.
The consequence sits in the next sentence. If you are prosecuted for a breach of health and safety law, and it is proved that you did not follow the relevant provisions of the Code, you will need to show that you have complied with the law in some other way, or a court will find you at fault. That is close to a reversal of the usual position, and it is why doing something different is a harder argument to run than it first sounds.
What L8 gives ACoP status to
The fourth edition applies Approved Code of Practice status to five specific areas. The rest of the document is guidance.
The three parts of HSG274
The technical guidance is published in three parts, each covering a different class of system. Which applies depends on what you operate, and plenty of sites need more than one.
Which one you are being asked for
An assessment written to L8 and an assessment written to HSG274 Part 2 are not alternatives, and a supplier who treats them as interchangeable is telling you something. L8 sets the duty. Part 2 sets the method for the system you probably have. A competent assessment of a hot and cold water system should reference both, and should tell you which parts of HSG274 apply to you and which do not.
Assessed against the right document.